Directory/Heath Andersen
Tuesday 3 November 2026
HA

Heath Andersen

Person
Data Centre Consultant · DC Design Africa
Consultant contactNot watchedQuiet 33 days
Identified
not yet
Contacted
not yet
Engaged
not yet
Working
not yet
Advocate
not yet
OrgDD
no source
Why they matterHigh
data centre design
no source
On ramp
Open slot
OwnerNS
Nick Searra
Assigned on the record

Activity

Last 52 weeks · 15 dated events
52 weeks agoless moretoday

Important dates

Every dated event on this record
01 Oct 2026
Meeting
Academic Paper Series OneSeries framed as community centered data centers with a community benefit index. Ohio LOI, Chicago distributed DC, Oberlin, thermal technologies (Rondo, caloric, Alfa Laval 70 degC). Vertiv (Rob Feeley, Greg Lehman) joined last 20 minutes: Greg Ratcliffe as key speaker, Russ Tipton on ORC. Joint NVIDIA, Anthropic, Vertiv call targeted end of next week.
daybreak · 02 Oct
17 Sep 2026
Meeting
Academic Paper Series OneNext: Contributor spreadsheet; V4 framework. Marked: * controls strategy of building; ! Excel sheet, economics and public policy. Source: Granola note 4cfc4412-432a-48d2-bef8-7bffdfb14740.
Manual · 28 Sep
17 Sep 2026
Meeting
Ohio DC Chat, HeathNext: Book Jared at NVIDIA. Source: Granola note 5bf628e9-717a-47b6-8969-f9c4503435e6.
Manual · 28 Sep
15 Sep 2026
Meeting
Microlink / Belden - Design Review & Capability AlignmentBelden: 124 year old manufacturer, 1,000+ patents, Layer 1 and 2 network infrastructure, on standards boards. Contacts: Henry Franc (data centre specialist), Mark Jones (Solutions Line Director), Christie Ketchum (solution consultant), Brian Kennedy (global commercial lead, data centres), Olivia Obregon (Americas execution). Not engineer of record; a support layer to EPC and technical contractors across planning, design, spec, build and operations, in white space and gray space (controls, SCADA, BMS). Scope: fibre, copper, racks, enclosures, PDUs, in rack cooling, rear door heat exchangers, direct to chip via partners, fault managed power, PON; owns Ruckus and Precision OT; assessments, PoC, installation, commissioning; modular kitted designs. MicroLink walked Genoa: phase 1 50 MW plus a solar array and an indoor farm; 30 MW now, ~400 MW by 2029, ~800 MW by 2031; 800 V DC ready RT-Pod modules; three loop closed water system; 55 degC out, boost to ~70 degC; ORC for cold storage and food processing; ~400 jobs target. Anthropic the primary customer target; owner meeting 19 Sep; Vertiv lead time ~16 months; MV switchgear and transformers globally scarce; wheeling Ohio to PJM blocked by regulation. Brian Kennedy exploring thought leadership on community positive data centres. Notebook: 1000 patents and deployment (Heinz); energy recapture with municipality; commercial terms; thought leadership.
daybreak · 02 Oct
18 Aug 2026
Meeting
TAS & MicroLinkDaybreak source: google calendar interaction ledger.
daybreak · 02 Oct
09 Aug 2026
Meeting
(no title)Daybreak source: google calendar interaction ledger.
daybreak · 02 Oct
16 Jul 2026
Meeting
ANA | Microlink - Data Center EBOSS IntegrationDaybreak source: google calendar interaction ledger.
daybreak · 02 Oct
16 Jul 2026
Meeting
Ohio River Coal to Renewable SiteDaybreak source: google calendar interaction ledger.
daybreak · 02 Oct
15 Jul 2026
Meeting
MicroLink and JacobsDaybreak source: google calendar interaction ledger.
daybreak · 02 Oct
14 Jul 2026
Meeting
Introduction - Vertiv / MicroLinkDaybreak source: google calendar interaction ledger.
daybreak · 02 Oct
13 Jul 2026
Meeting
(no title)Daybreak source: google calendar interaction ledger.
daybreak · 02 Oct
10 Jul 2026
Meeting
MicroLink and Gigawatt LandDaybreak source: google calendar interaction ledger.
daybreak · 02 Oct
09 Jul 2026
Meeting
Torus & MicrolinkDaybreak source: google calendar interaction ledger.
daybreak · 02 Oct
08 Jul 2026
Meeting
Edge Discussion - MicroLink & FriendsDaybreak source: google calendar interaction ledger.
daybreak · 02 Oct
01 Jul 2026
Meeting
(no title)Daybreak source: google calendar interaction ledger.
daybreak · 02 Oct
date not recorded
Meeting
(no title)Organiser heath@dcdesign.africa. Daybreak source: outlook calendar sweep 2026-09-01.
daybreak · 02 Oct
date not recorded
Created
Added to the directory
Loom · 13 Aug
Dates arrive from four places: the daily mail and calendar sweep, the monthly search run, Apollo and Clay enrichment, and anything typed by hand.

Signals

all reviewed
No signals on this record yet.
Watching
No official route reads a person's posts. Signals come from published agendas, press, Clay thought leadership and Apollo job change.

Contact

Apollo and Clay fill the blanks
Emailheath@dcdesign.africano source
PhoneEnrichApollo
LinkedInhttp://www.linkedin.com/in/heathandersen;no source
OrganisationDC Design Africano source
OwnerNick Searrano source
RoleData Centre Consultantno source
StageCaptureManual
On rampCaptureManual
Why they matterdata centre designno source
Introduced byCaptureManual

Warm path

Who can open a door
First degreeCaptureManual
Shared historyEnrichClay
Second degreeMapClay

What they touch

Sites, opportunities, documents
SitesLinkManual
OpportunitiesLinkManual
Documents sentUploadSweep
Topics they raiseCaptureManual

Open actions

0 open
Nothing open on this record.

Where each field comes from

ManualWhy they matter, on ramp, warm path, call notes.
Daily sweepMail and calendar events, documents sent, last touch.
ApolloRole, seniority, tenure, job change, employer hiring.
ClayLocation, profile links, work history, thought leadership.
Monthly searchMedia mentions, agendas, speaking slots, awards.