revised NPS/ECP behind-the-meter gas offer, gate blocked, Aug 2026 de facto deadline.
OpenCaterpillar full team 15 Jul 20:00 SAST. Chad Hand, Nick Halabi, Brandon Mabe, Chance Canon. Schedule position plus 30/60/90.
OpenClimate Finance Solutions 14 Jul 18:30 SAST with Joel Armin-Hoiland and Debapriya Mazumdar. Petros and Apollo met 10 Jul, they need a site and a customer in place first.
Openfollow-up to Ari and Mike with the Mansfield 100MW requirement and a working session ask. Via David Muller.
OpenMansfield needs 100 MW bridge by Dec 2026 · natural gas backlog into 2029 · shift toward 20 to 40 MW sites · permanent 300 MW by 2028 and 600 MW by late 2029 · exploring rental fleets and GPPS · Jess to check equipment availability, intro the turbine team, connect the BD team, and schedule the follow up
OpenEverything the gate needs to see before this site can carry an LOI, grouped into the four families the gate grades. The verdict on each family and the two screening figures behind it live here too, so the whole screening position sits on one tab.