Site  ·  Pennsylvania  ·  UGI

Bethlehem

UGI  ·  Pennsylvania  ·  8 MW
Pilot deployment, 800V DC architecture, UGI as the utility relationship. Next step is the large project load form to Rich Hazzard.
SP
Rung 07 of 09  ·  1 linked opportunity
Target LOI
not set
no target LOI recorded
The road to LOI Rung 7 of nine  ·  Heads of terms  ·  no entry date recorded
Click a rung to set where this site is right now. R8 and R9 are closed: no letters of intent are held anywhere in the portfolio.
Days to target LOI
not set
no target LOI recorded
Outstanding on this rung
nothing recorded
no checklist on this rung yet
Waiting on UGI
nothing recorded
no checklist on this rung yet
Blocked
nothing recorded
no checklist on this rung yet

What this rung needs

R7 Heads of terms. Everything that has to be true before the site can step up.
nothing recorded
Nothing is recorded against this rung yet.

Tasks on this site

Anything that is not a rung requirement but still has to happen
0 open
No tasks yet.

Next up: Partner internal approval

Start what can be started now
Rung 8
Nothing is recorded against the next rung yet.

Who has the ball

No checklist on this rung yet, so nobody holds anything on the record.

Flags

0 live
No flags raised on this site yet.

Key dates

No key dates recorded on this site yet.

Linked opportunities

1
Bethlehem 800V DC pilotBuild

UGI large project load form back to Rich Hazzard.

Open
0 of 0 established 0 awaiting partner data 0 still to request 4 of 4 gates graded

Everything the gate needs to see before this site can carry an LOI, grouped into the four families the gate grades. The verdict on each family and the two screening figures behind it live here too, so the whole screening position sits on one tab.

Power

nothing recorded
Gate verdict Pass
Delivered powerUS$ per MWh at the meter. Pass line 75, kill line 130.
61

Thermal sink

nothing recorded
Gate verdict Pass
Sink typeWhat the recovered heat is sold into.
district heat

Physical site

nothing recorded
Gate verdict Pass
Nothing recorded in this family yet.

Partner

nothing recorded
Gate verdict Pass
Nothing recorded in this family yet.

Paper trail to LOI

Every instrument and artefact on the path, in the order it appears
nothing recorded
No documents on this site yet.
Drop files here or click to uploadThis site's folder: drawings, quotes, agreements, studies

Power

4
Capacity
8 MW
migrated from card_metrics · 20 Jul
Capacity unlock
Submitted to GridCare at 8 MW for transmission headroom analysis
GridCare call · 23 Jul · 23 Jul
Utility
UGI
migrated from card_metrics · 20 Jul
Power path
PJM
Bethlehem CEA and data center heat campus assessment · 10 Jun

Thermal

1
Heat offtake
controlled environment agriculture on the grow floors, three loop design with dry cooler rejection retained
Bethlehem CEA and data center heat campus assessment · 10 Jun

Land

2
Site
former Bowery Farming facility, 1025 Feather Way, inside Bethlehem Commerce Center
Bethlehem CEA and data center heat campus assessment · 10 Jun
Owner
Lehigh Valley Industrial Park (LVIP VII), a 405 ha (1,000 acre) redevelopment of the former Bethlehem Steel plant
Bethlehem CEA and data center heat campus assessment · 10 Jun

Partner and commercial

1
Next milestone
load form
migrated from card_metrics · original label Next · 20 Jul

Permitting

1
Community risk
the narrative trap is broken promises. 104 Bowery layoffs (WARN effective 1 Nov 2024) and the Martin Tower implosion frame local memory
Bethlehem CEA and data center heat campus assessment · 10 Jun

People

2
Operating partner candidate
Little Leaf Farms
Bethlehem CEA and data center heat campus assessment · 10 Jun
Research partner
Lehigh University ACES, actively seeking industry partners
Bethlehem CEA and data center heat campus assessment · 10 Jun

People on this site

1
MicroLinkShane

Activity

From email and from this site's spine
6 events
Activity · last 52 weeks6 events · heaviest week: 26 Jul
52 weeks ago lessmore today
27 Jul
Rung set to R7 Heads of terms. by Nick Searra
27 Jul
Rung set to R6 Utility and BTM position. by Nick Searra
27 Jul
Rung set to R5 Site access and feasibility. by Nick Searra
27 Jul
Rung set to R4 Concept and pre feasibility. by Nick Searra
27 Jul
Rung set to R2 Desktop qualification. by Nick Searra
27 Jul
Rung set to R5 Site access and feasibility. by Nick Searra

Notes

Site calls, schedule thinking, anything learned in meetings
0
No notes yet. Site calls, schedule thinking, and anything learned in meetings lands here.