Power
7Capacity
tbd · owed
migrated from card_metrics · 20 Jul
Gas route
Philadelphia gas pipeline constraints rule out gas generation at this site
GridCare call · 23 Jul · 23 Jul
PJM check
GridCare to check interconnection status against their utility coverage
GridCare call · 23 Jul · 23 Jul
Power path
PJM · PECO · EMAAC
Grays Ferry interconnection assessment · 30 Jun
Interconnect
230 kV at the Vicinity CHP, transmission study needed
Grays Ferry interconnection assessment · 30 Jun
Node headroom
none published
Grays Ferry interconnection assessment · 30 Jun
Substation
PECO US$22M upgrade complete
Grays Ferry interconnection assessment · 30 Jun
Thermal
7Heat offtake
Vicinity · one customer
migrated from strip_metrics · supersedes card_metrics value "Vicinity offtake" (label Heat) · 20 Jul
Host plant
Schuylkill Station, 2600 Christian Street, 1997 natural gas combined cycle CHP
Vicinity Grays Ferry facility dossier · 30 Jun
Plant capacity
163 MW installed, 118 MW gas turbine plus 45 MW steam turbine, about 193 MW nameplate
Vicinity Grays Ferry facility dossier · 30 Jun
Steam output
up to 635 t/h (1.4M lb/hr)
Vicinity Grays Ferry facility dossier · 30 Jun
Network
66 km (41 miles) of steam loop serving about 400 buildings, roughly 9.3M m² (100M sq ft)
Vicinity Grays Ferry facility dossier · 30 Jun
Warm loop
38 to 60°C (100 to 140°F) delivery, ceiling 65°C (149°F)
Vicinity Grays Ferry facility dossier · 30 Jun
Uplift equipment
Everllence (MAN) ammonia R717 river source heat pump with MVR steam compression
Vicinity Grays Ferry facility dossier · 30 Jun
Partner and commercial
5Binding constraint
Enbridge gas lateral
migrated from strip_metrics · warn flag set · 20 Jul
Next milestone
NDA · then heat study
migrated from strip_metrics · original label Next · supersedes card_metrics value "tbd · owed" (label Next) · 20 Jul
Delivered price
US$80 to 180 per MWh
Grays Ferry interconnection assessment · 30 Jun
Absorbable loadinferred
20 MW over 2026 to 2030 against a single creditworthy anchor. 80 MW needs materially more
Philadelphia market assessment · 30 Jun
Near terminferred
6 MW feasible now, low risk
Philadelphia market assessment · 30 Jun