1 Aug
Archived: removed from board · Prepare the site deck and photo for Gigawatt
1 Aug
Archived: removed from board · Jeff to attend the Gigawatt luncheon
20 Jul
Archived: removed from board · Review the Gigawatt data room (Ideals VDR)
20 Jul
Archived: removed from board · Prepare Matt Carlsson intro-fee agreement for Gigawatt
13 Jul
Action added. Prepare the site deck and photo for Gigawatt. Owner Jeff Svedahl.
13 Jul
Joseph City context and the REALAZ.org luncheon in Snowflake, Arizona. Jeff invited to represent MicroLink on integrated data center solutions and agricultural heat reuse. Gigawatt presentation materials received.
12 Jul
Document uploaded. GigaWatt_Luncheon_Remarks.docx
12 Jul
Document uploaded. GigaWatt_Arizona_Diligence_Summary.docx
12 Jul
Rung set to R2 Desktop qualification. by Jeff Svedahl
12 Jul
Rung set to R4 Concept and pre feasibility. by Jeff Svedahl
10 Jul
Data room open. Via Ideals VDR (Gordon Baier). Offer review logged (38, gate blocked). Matt Carlsson intro-fee agreement to prepare.
10 Jul
Rung set to R2 Desktop qualification. by Jeff Svedahl
10 Jul
Rung set to R7 Heads of terms. by Jeff Svedahl
10 Jul
Rung set to R6 Utility and BTM position. by Jeff Svedahl
10 Jul
Rung set to R5 Site access and feasibility. by Jeff Svedahl
10 Jul
Rung set to R4 Concept and pre feasibility. by Jeff Svedahl
10 Jul
Task assigned to JS from JS: Jeff to attend the Gigawatt luncheon
8 Jul
Document uploaded. 15 GigaWatt_Land_Site_One Pager, June 25th 2026.pdf
8 Jul
Site video added. GigaWatt Land campus overview.