Team Project Space / Sites / Gigawatt Land
Directory Tools Archive Saturday 5 September 2026
Site  ·  Arizona

Gigawatt Land

Arizona
17,000+ acre former mining site via Matt Carlsson. Counterparty claims 15+ GW, verify in the data room. Met 7 Jul, second meeting Fri 10 Jul. Anthropic pitch candidate.
NSSO
Rung 02 of 09  ·  2 linked opportunities
Target LOI
not set
no target LOI recorded
The road to LOI Rung 2 of nine  ·  Desktop qualification  ·  no entry date recorded
Click a rung to set where this site is right now. R8 and R9 are closed: no letters of intent are held anywhere in the portfolio.
Days to target LOI
not set
no target LOI recorded
Outstanding on this rung
nothing recorded
no checklist on this rung yet
Waiting on the partner
nothing recorded
no checklist on this rung yet
Blocked
nothing recorded
no checklist on this rung yet

What this rung needs

R2 Desktop qualification. Everything that has to be true before the site can step up.
nothing recorded
Nothing is recorded against this rung yet.

Tasks on this site

Anything that is not a rung requirement but still has to happen
0 open
No tasks yet.

Next up: Outreach and NDA

Start what can be started now
Rung 3
Nothing is recorded against the next rung yet.

Who has the ball

No checklist on this rung yet, so nobody holds anything on the record.

Flags

0 live
No flags raised on this site yet.

Key dates

No key dates recorded on this site yet.

Linked opportunities

2
Gigawatt data room reviewMeet

data room review and claims verification, second meeting Fri 10 Jul.

Open
Gigawatt Anthropic one pagerBuild

produce the Anthropic one pager off the data room.

Open
0 of 0 established 0 awaiting partner data 0 still to request 3 of 4 gates graded

Everything the gate needs to see before this site can carry an LOI, grouped into the four families the gate grades. The verdict on each family and the two screening figures behind it live here too, so the whole screening position sits on one tab.

Power

nothing recorded
Gate verdict Pass
Delivered powerUS$ per MWh at the meter. Pass line 75, kill line 130.
52

Thermal sink

nothing recorded
Gate verdict Kill
Sink typeWhat the recovered heat is sold into.
powered land

Physical site

nothing recorded
Gate verdict Pass
Nothing recorded in this family yet.

Partner

nothing recorded
Gate verdict nothing recorded
Nothing recorded in this family yet.

Paper trail to LOI

Every instrument and artefact on the path, in the order it appears
0 of 4 complete
GigaWatt_Luncheon_Remarks.docxuploaded 2026-07-12
not graded
12 Jul
GigaWatt_Arizona_Diligence_Summary.docxuploaded 2026-07-12
not graded
12 Jul
15 GigaWatt_Land_Site_One Pager, June 25th 2026.pdfuploaded 2026-07-08
not graded
8 Jul
GigaWatt Land · 15 GW AI data center campus overview15 GW AI data center campus overview
not graded
8 Jul
Open
Drop files here or click to uploadThis site's folder: drawings, quotes, agreements, studies

Power

3
Claimed capacity
15+ GW
migrated from card_metrics · original label Claimed · 20 Jul
Studied capacityclaimed
1,500 MW at one point of interconnection, first load about 200 MW
GigaWatt Sun Mesa Cholla offer review v1.0 · 10 Jul
Interconnect
queue stage, pre final investment decision
GigaWatt Sun Mesa Cholla offer review v1.0 · 10 Jul

Thermal

1
Heat offtake
none. No industrial host on site
GigaWatt Sun Mesa Cholla offer review v1.0 · 10 Jul

Land

2
Land area
17,000+
migrated from card_metrics · original label Acres · 20 Jul
Areaclaimed
6,880 ha (17,000 acres), former mining site
GigaWatt Sun Mesa Cholla offer review v1.0 · 10 Jul

Partner and commercial

5
Land price
from US$383k per hectare (US$155k per acre)
GigaWatt Sun Mesa Cholla offer review v1.0 · 10 Jul
Siting preference
Northern sites preferred, heat recovery is worth more where heating demand is real
Caterpillar call · 23 Jul · 23 Jul
Interconnection
US$195k per MW (US$195 per kW)
GigaWatt Sun Mesa Cholla offer review v1.0 · 10 Jul
Power price
not stated by the counterparty
GigaWatt Sun Mesa Cholla offer review v1.0 · 10 Jul
Gate
reviewed 38 of 100, gate blocked on three terms
GigaWatt Sun Mesa Cholla offer review v1.0 · 10 Jul

People on this site

1
MicroLinkNick · Sancha

Activity

From email and from this site's spine
19 events
Activity · last 52 weeks19 events · heaviest week: 5 Jul
52 weeks ago lessmore today
1 Aug
Archived: removed from board · Prepare the site deck and photo for Gigawatt
1 Aug
Archived: removed from board · Jeff to attend the Gigawatt luncheon
20 Jul
Archived: removed from board · Review the Gigawatt data room (Ideals VDR)
20 Jul
Archived: removed from board · Prepare Matt Carlsson intro-fee agreement for Gigawatt
13 Jul
Action added. Prepare the site deck and photo for Gigawatt. Owner Jeff Svedahl.
13 Jul
Joseph City context and the REALAZ.org luncheon in Snowflake, Arizona. Jeff invited to represent MicroLink on integrated data center solutions and agricultural heat reuse. Gigawatt presentation materials received.
12 Jul
Document uploaded. GigaWatt_Luncheon_Remarks.docx
12 Jul
Document uploaded. GigaWatt_Arizona_Diligence_Summary.docx
12 Jul
Rung set to R2 Desktop qualification. by Jeff Svedahl
12 Jul
Rung set to R4 Concept and pre feasibility. by Jeff Svedahl
10 Jul
Data room open. Via Ideals VDR (Gordon Baier). Offer review logged (38, gate blocked). Matt Carlsson intro-fee agreement to prepare.
10 Jul
Rung set to R2 Desktop qualification. by Jeff Svedahl
10 Jul
Rung set to R7 Heads of terms. by Jeff Svedahl
10 Jul
Rung set to R6 Utility and BTM position. by Jeff Svedahl
10 Jul
Rung set to R5 Site access and feasibility. by Jeff Svedahl
10 Jul
Rung set to R4 Concept and pre feasibility. by Jeff Svedahl
10 Jul
Task assigned to JS from JS: Jeff to attend the Gigawatt luncheon
8 Jul
Document uploaded. 15 GigaWatt_Land_Site_One Pager, June 25th 2026.pdf
8 Jul
Site video added. GigaWatt Land campus overview.

Notes

Site calls, schedule thinking, anything learned in meetings
0
No notes yet. Site calls, schedule thinking, and anything learned in meetings lands here.
Visible to everyone on this site